Mistakes while doing Industrial Flooring.
- Weak Strength of concrete Floor- While doing Industrial flooring it is very import to have strength in flooring. PPC flooring is not good option for it. Tremix flooring is best option for Industrial flooring. Strength should be more than M20. Here M stands for Mix and Number for strength in N/mm2. Mixing ratio of M20 concrete is (1 Cement : 1.5 Sand : 3 Aggregates)
- Rough Finishing of Concrete Floor- Concrete flooring should have smooth finish. Rough floor can’t be clean easily. Dust and dart deposit in rough surfaces. It is very difficult to clan the floor. We can’t maintain hygienic condition in premises
- Undulation in Flooring- For easy material handling with trolley and fork lift, floor must be plan. Also floor gets easily damaged due to undulation in floor.
- No groove in floor- This is also one of the mistake many people do. When we lay a concrete floor. Floor starts doing movement of contraction and expansion. This, movement create crack in floor. To avoid create generation in flooring we must have to do groove cutting on 3 meter by 3 meter size square.
- Not doing Epoxy Flooring-It is very import to do Epoxy Flooring. Epoxy is an adhesive which has 3 times more strength than concrete floor. It’s come in many colors. It is smooth having anti microbial property.
Benefits of doing Epoxy Flooring-
- It protects concrete
- It makes easy material handling
- Easy cleaning so help to maintain hygienic condition
- Aesthetic look
- Increase lighting effects.
For more details visit https://anantepoxyflooring.in
Featured articles and news
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.





















Comments
https://www.designingbuildings.co.uk/wiki/Marketing_opportunities_on_Designing_Buildings
https://www.designingbuildings.co.uk/wiki/Editorial_policy
https://www.designingbuildings.co.uk/wiki/Page_about_me